Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

Moldova 1
moldova1.md > p > 80948

EBRD-backed project to repair 38 km of the Leușeni–Chișinău–Dubăsari national road

4+ day, 9+ hour ago  (297+ words) A section of the national road Leușeni-Chișinău-Dubăsari will be repaired. The National Road Administration (AND) has announced the initiation of the procurement procedure for rehabilitation works on a 37.8-kilometer section. The rehabilitation of this road sector is a strategically important…...

Moldova 1
moldova1.md > p > 77707 > 132-million-lei-allocated-for-chisinau-hincesti-road-repair

132 million lei allocated for Chișinău–Hîncești road repair

1+ mon, 2+ week ago  (292+ words) The national road R3 between Chisinau and Hancesti will be repaired. The works are scheduled to begin in the second half of June 2026, with a four-month execution period. To efficiently manage execution, the designated sector has been divided into four lots....